Course:MTRL466-adhesivebonding/Group2/November 4
Project Name | Adhesive Bonding |
---|---|
Group | 2 |
Current Meeting | November 4, 2011 |
Minutes Prepared By | Mandy Chen |
Attendees
Chad, Mandy, Shauna, Zoe, Andy and Kyle
Minutes
Midterm Report
- Flow/Organization
- Adhesive bonding is in need and constraint and lit review- overlap
- Lead-ins/introductions!
- Need and constraint
- Talk about why building process models
- Specific need in what we are doing
- Need: 3 steps of models
- Problem specification
- Constraints: Missed a bunch
- Objective: Be more specific (Products coming out of facility/time)
- Literature review- reference!
Adhesive bonding
- Validation done
Heat transfer
- Need a model to find out the heat transfer to each material because our materials are sensitive to temperature
- Explain the logic
- Explain the limitation of explicit finite difference- time step
Recovery
- Assume linear fit between v and T- not physical reason to why v is a function of T
- Explain that we don't know the relationship for lower temperature- need more time
- Strain is also a function of time
- Check v at 0.58 and 1.03. At 50% reduction, what is the time difference between the prestrain?
Optimization
- alpha >= 0.9 (Alpha peak)
- Sigma6000 >= 0.9 (sigma peak)
- Sigma5000 >= 0.9 (Sigma original)
- First time step- quickest way to reach
- Constraint: Paint bake- time and temperature
Economic analysis
- estimate how much saving- energy and time
- decrease process cycle time
- How many more vehicles?
- How much money?
- Decrease time and fewer resources?
- Capital cost of paint bake booth
- Surrey paint bake booth
- Capital cost reduction?
- Electricity reduction?
- How many paint booths?
Agenda
- Kyle will lead the meeting
- Communicate on the progress of each model, model intergraton, and process optimization
- Get feedback from Chad and dicide future steps
Adhesive Bonding
Heat Transfer
- Finished the model validation under both the Newtonian and non-Newtonian conditions.
Recovery
Precipitation Hardening
- Validated the model with the temperature profile given by the heat transfer model at 4 oven temperatures and 1 h.
Model Optimizaiton
- Formulated procedures for optimization
- waiting for the combined model
- Researching on energy cost --- need data from GM
Future Plans
- Economic Analysis*
- Finding h and Tsurface for Adhesive curing, 5000 strength and 6000 strength