By the Hint, for Patch 1 a secant line has maximum slope just a bit before reaches its maximum. An approximate optimal time is .
For Patch 2, the slope is largest when . Hence the optimal time is .
To summarize, the optimal time (indicated by the red dots) for Patches 1 and 2 are as follows.